Round Wire Basket with Wooden Lid 2 Pack

Original price was: $44.99.Current price is: $13.50.

20 People watching this product now!
Description

DURABLE: Crafted from heavy-duty metal wire with reinforced construction (2.5mm and 3.5mm diameters), each wire basket supports up to 39.6 lbs on the lid. NESTABLE: Maximize your storage without sacrificing space. These round wire baskets neatly nest inside one another when not in use-perfect for small apartments, closets, countertop, or cabinets. MULTI-FUNCTIONAL: The wood-style lid not only hides clutter but doubles as a water-resistant surface-perfect for setting down a book, plant, or drink. Made from durable melamine and PVC for long-lasting use. EASY ASSEMBLY: Simply attach the included rubber stoppers to keep the lid in place. Easy to move, lift, and reposition whenever you need a flexible storage option. GREAT SIZE: Individual Basket- 12.28″L x 12.28″W x 10.20″H.